Issue
Kesgrave Hall Nr Ipswich, is a Spa and Events Centre. Over the past few years, Kesgrave Hall has become increasingly popular, and this has led to a lack of available parking at peak times, and for weddings events and conferences. The parking solution needed to be fully permeable to meet latest regulations, able to reduce costs to avoid additional drainage and to be in keeping with the high standard of the location. It also was needed to be as low-maintenance as possible to reduce costs further.
Solution
Bodpave 85 Permeable Cellular Pavers with a gravel fill was chosen to meet the requirements on site. The Bodpave 85 was selected as Bodpave 85 is a tried and tested product that has been on the market for 20 years. During this time, it has shown to live up to expectations when installed correctly and used appropriately. Bodpave 85 is a tried and tested solution in often hardworking and trying conditions.




Benefits
The above solution meant that an overflow car park was laid that met the demands. The Bodpave 85 provided the extra required parking at peak times at a relatively low cost and needed no extra drainage. The gravel filled Bodpave 85 is aesthetically pleasing and is very low maintenance enabling the staff to be employed on other duties.
Recommended Products
Are you looking to expand car parking on your premises? Want to increase parking space for visitors and customers?
Contact our team of experts, let us know your requirements, and we can recommend a solution for you!